Columbia Drive Project – August 2011 II

Now that the project has passed all of its City inspections for rough framing, rough electrical, rough framing, concrete footings etc., it is now time for the insulation to be installed.  As you can see from the attached picture, it is extremely important to strengthen and increase the thermal factors of the residence when the […]

Read More

Columbia Drive Project – August 2011 RM

In order to create a more open and interactive space, the architect designed a massive kitchen that is surrounded by the great room.  To accomplish this objective, the structural engineer provided calculations for a large laminated beam that extends from the exterior of the residence to the main hallway.   Large concrete footings enforced with […]

Read More

Rancho Mirage Project – August 2011 II

The framing has been completed for the new powder bathroom, which is located in an area near the entry way.  The new sewer line was installed by locating the existing line and providing a new run into this powder bathroom location.  The architectural plans show where the existing line is located, but it is still […]

Read More

Rancho Mirage Project – August 2011

In this Rancho Mirage Project, we are in the process of the rough work, which includes the rough framing, rough electrical, rough plumbing and concrete footing work. As you can see in the picture, there is a considerable amount of framing required to restructure the residence in order to redistribute the new structural loads so that the home can have a more open feeling throughout. The electrician is working on running new circuits to the kitchen so that the appliances have the proper loads fed from the main panel.