Damian Trevor – New Pool Area

The construction crew is removing the existing plaster and gunite to prepare for the new pool area. An additional drain will be added to the pool in order to comply with current code requirements and the waterline tile will also be updated. The raised bond beam and surface materials will all be transformed and remodeled to produce an amazing finish.20130828_094513