Rancho Mirage Project – August 2011 II

The framing has been completed for the new powder bathroom, which is located in an area near the entry way.  The new sewer line was installed by locating the existing line and providing a new run into this powder bathroom location.  The architectural plans show where the existing line is located, but it is still […]

Read More

Rancho Mirage Project – August 2011

In this Rancho Mirage Project, we are in the process of the rough work, which includes the rough framing, rough electrical, rough plumbing and concrete footing work. As you can see in the picture, there is a considerable amount of framing required to restructure the residence in order to redistribute the new structural loads so that the home can have a more open feeling throughout. The electrician is working on running new circuits to the kitchen so that the appliances have the proper loads fed from the main panel.

Read More

Going Green

Damian Trevor and Team Sun Construction firmly believe that going green needs to be discussed in greater depth in order to make sure that the consumer selects the right options. Damian Trevor further states that some background and history on the subject matter may be best to consider. For example, in 2004 the Green Building Council […]

Read More